Effect of Program Planning Practices on Program Performance: A Case of Vision Umurenge Programme in Gasabo District, Rwanda
DOI:
https://doi.org/10.51867/ajernet.6.1.74Keywords:
Gasabo District, Program Planning Practices, Program Performance, Rwanda, Vision Umurenge ProgramAbstract
The purpose of this study was to assess the effect of project planning practices on performance of Vision Umurenge Programmes (VUP) in Gasabo District, specially to assess the effect of project human resource planning on VUP performance, to examine the effect of risk planning on VUP performance and to examine the effect of time planning on VUP performance in Gasabo district. The theories that guided this study were the goal settings, resource-based view and the theory of constraints. The study adopted descriptive and correlational research design in addressing the statement of the problem. Questionnaire and interview guides were used to collect data from 97 respondents selected from a population of 26,593 using census and simple random sampling techniques. A census method and simple random sampling were used to get sample for the study. Data was analyzed using descriptive and inferential statistics methods using statistical SPSS. Qualitative data was analyzed thematically. The study results showed that that human resource planning rates had an overall mean of (4.01˂4.32˂5.00) which indicates a very high mean and standard deviation of (0.848˃0.5) which indicates a no-homogeneity in responses. The overall descriptive statistic mean of risk planning was (4.01˂4.29˂5.00) an indication very high mean and standard deviation of (0.823˃0.5) an indication of homogeneity in responses. The overall time planning mean was (4.01˂4.29˂5.00) an indication of very high mean and standard deviation of (0.848˃0.5) an indication of no-homogeneity in responses. The study further found that in the regression model the association between human resource planning and program performance was positive and significant effect (R=0.563, sig=0.000˂0.05). It was evident that there is a positive association and significant effect between risk planning and program performance (R=0.294, sig=0.005˂0.05), and there was a positive association and significant effect between time planning and program performance (R=0.601, sig=0.000˂0.05). The study concludes that program human resources planning, risk planning and time planning significantly contribute to predicting and positively influencing Vision Umurenge Programme in Gasabo district. The study suggests that local authorities should provide adequate training to human resources, address diverting cash for beneficiaries to unplanned activities, and assess their graduation. It also recommends that beneficiaries should understand the types of VUP components. Risk planning is crucial for program performance, and project scope should be used to estimate risk, with the Work Breakdown Structure (WBS) linked to the project plan. Accurate activity sequencing is essential for accurate and achievable schedules. Regular checks and controls are crucial for early identification of deviations, allowing the project team to take necessary actions.
Downloads
References
Abugre, J. B., Minlah, B., & Nasere, D. (2023). The impact of time management behaviors on employee performance in humanitarian service organizations: A study of selected NPOs in Ghana. Journal of African Business, 24(1), 129-146.
https://doi.org/10.1080/15228916.2022.2031828
Abutabenjeh, S., & Jaradat, R. (2018). Clarification of research design, research methods, and research methodology: A guide for public administration researchers and practitioners. Teaching Public Administration, 36(3), 237-258.
https://doi.org/10.1177/0144739418775787
Agustian, K., Pohan, A., Zen, A., Wiwin, W., & Malik, A. J. (2023). Human resource management strategies in achieving competitive advantage in business administration. Journal of Contemporary Administration and Management, 1(2), 108-117. https://doi.org/10.61100/adman.v1i2.53
Alabdullah, T. T. Y., & Hussein, Z. A. A. (2023). Risk management, female leadership, and project management performance: A study in Oman. International Journal of Scientific and Management Research, 6(6), 77-94.
https://doi.org/10.37502/IJSMR.2023.6606
Anafi, N. F. M., Noor, N. M., & Maidin, A. J. (2023). The 4th tier micro-planning development: A review of practices in Malaysia and Türkiye. Journal of Architecture, Planning and Construction Management, 13(2), 82-95.
Anwar, G., & Abdullah, N. N. (2021). The impact of human resource management practice on organizational performance. International Journal of Engineering, Business and Management, 5(1), 1-13. https://doi.org/10.22161/ijebm.5.1.4
Crawford, J. K. (2021). Project management maturity model. Auerbach Publications. https://doi.org/10.1201/9781003129523
Davis, G. F., & DeWitt, T. (2021). Organization theory and the resource-based view of the firm: The great divide. Journal of Management, 47(7), 1684-1697.
https://doi.org/10.1177/0149206320982650
Gamo, B. R., Woldeamanuel Habebo, T., Tsegaye Mekonnen, G., & Park, D. B. (2022). Determinants of community participation in a watershed development program in Southern Ethiopia. Community Development, 53(2), 150-166.
https://doi.org/10.1080/15575330.2021.1946576
Gyepi-Garbrah, T., Preko, A., Mohammed, I., & Mohammed, I. (2023). Using goal-setting theory and expectancy theory to understand career goal implementation in the hospitality industry. Journal of Hospitality, Leisure, Sport & Tourism Education, 32, 100425. https://doi.org/10.1016/j.jhlste.2023.100425
Ika, L. A., & Pinto, J. K. (2022). The "re-meaning" of project success: Updating and recalibrating for modern project management. International Journal of Project Management, 40(7), 835-848. https://doi.org/10.1016/j.ijproman.2022.08.001
Karangwa, T. (2021). Factors affecting VUP-financial services loans repayment in Rwanda: A case study of Gisagara District (Doctoral dissertation, University of Rwanda).
Kimotho, M. W. (2023). Influence of project risk management on the performance of government-funded housing construction projects in Nairobi City County, Kenya. International Journal of Social Sciences Management and Entrepreneurship, 7(1), 595-609.
Kinoti, M. K., & Sang, P. K. (2022). Project constraints management and completion of constituency development fund projects in Nairobi City County, Kenya. Journal of Entrepreneurship & Project Management, 2(6), 1-13.
https://doi.org/10.70619/vol2iss6pp1-13
Liu, B., Xue, B., Meng, J., Chen, X., & Sun, T. (2020). How project management practices lead to infrastructure sustainable success: An empirical study based on goal-setting theory. Engineering, Construction and Architectural Management, 27(10), 2797-2833. https://doi.org/10.1108/ECAM-08-2019-0463
Mishra, A. K. (2020). Implication of the theory of constraints in project management. International Journal of Advanced Trends in Engineering and Technology, 5(1), 1-13.
Mohammed, A. J. (2023). Evaluation of time overruns and time management techniques in road construction projects in Erbil City. Journal of Engineering and Sustainable Development, 27(4), 499-510.
https://doi.org/10.31272/jeasd.27.4.7
Moise, T., & Richard, K. (2023). Impact of agricultural projects at Holland Greentech, Rwanda. Journal of Entrepreneurship & Project Management, 3(2), 36-53. https://doi.org/10.70619/vol3iss2pp36-53
Mugabo, J. (2018). Assessment of the limitations of Vision 2020 Umurenge Program (VUP) to uplift socio-economic status of the poor people in Kayonza District (Doctoral dissertation, University of Rwanda).
Muthuveeran, A. A. S., Tahir, O. M., Hassan, M. A., & Yin, I. (2022). Investigating the current risk management process practice in Malaysia landscape planning projects. Planning Malaysia, 20(1), 48-63. https://doi.org/10.21837/pm.v20i20.1078
Nayak, B., Bhattacharyya, S. S., & Krishnamoorthy, B. (2023). Integrating the dialect perspective of resource-based view and industrial organization theory for competitive advantage: A review and research agenda. Journal of Business & Industrial Marketing, 38(3), 656-679. https://doi.org/10.1108/JBIM-06-2021-0306
Ndayisaba, O., & Mulyungi, P. (2018). Effect of resource management on project success implementation: A case of Strengthening Livelihoods in Rural Rwanda Project. International Journal of Research in Management, Economics and Commerce, 8(5), 32-41.
Orue, A., Lizarralde, A., Amorrotu, I., & Apaolaza, U. (2021). Theory of constraints case study in the make-to-order environment. Journal of Industrial Engineering and Management, 14(1), 72-85. https://doi.org/10.3926/jiem.3283
Plattfaut, R. (2022). On the importance of project management capabilities for sustainable business process management. Sustainability, 14(13), 7612.
https://doi.org/10.3390/su14137612
Ployhart, R. E. (2021). Resources for what? Understanding performance in the resource-based view and strategic human capital resource literature. Journal of Management, 47(7), 1771-1786. https://doi.org/10.1177/01492063211003137
Prah, S., Asante, B. O., Aidoo, R., Mensah, J. O., & Nimoh, F. (2023). Impact of agricultural policy intervention on yield and profitability of maize farmers: The case of planning for food and jobs programme in Ghana. Cogent Food & Agriculture, 9(1), 2249928. https://doi.org/10.1080/23311932.2023.2249928
Quick, J., & Hall, S. (2015). Part three: The quantitative approach. Journal of Perioperative Practice, 25(10), 192-196.
https://doi.org/10.1177/175045891502501002
Salsabila, S., Radhiana, R., Juwita, J., & Mauliza, P. (2022, December). Challenges of the resource-based view approach in improving business organizational performance. Proceedings of International Conference on Multidisciplinary Research, 5(2), 120-125. https://doi.org/10.32672/pic-mr.v5i2.5416
Scala, N. M., Schiavone, V., Olivieri, H., Seppänen, O., Alves, T. D. C., Liu, M., & Granja, A. D. (2023). Comparative analysis of planning with the critical path method, last planner system, and location-based techniques in Brazil, Finland, and the United States. Engineering Management Journal, 35(3), 237-256.
https://doi.org/10.1080/10429247.2022.2069981
Schlegel, D., Schuler, K., & Westenberger, J. (2023). Failure factors of AI projects: Results from expert interviews. International Journal of Information Systems and Project Management (IJISPM), 11(3), 25-40. https://doi.org/10.12821/ijispm110302
Sitati, P. J., & Muchelule, Y. (2023). Project planning and implementation of cash transfer programs in Bungoma County, Kenya. International Journal of Management and Business Research, 5(2), 245-258.
Taherdoost, H. (2022). How to conduct an effective interview: A guide to interview design in research studies. International Journal of Academic Research in Management, 11(1), 39-51.
Umamaheswari K., Neelam M.m & Vidhya K (2022). Human Resources Planning & Managerial Performance: A Study of the Rwanda Housing Authority, Kigali Rwanda. International Journal of Trend in Scientific Research and Development (IJTSRD), 6(4), 42456- 6470.
Vasudevan, H. (2021). Resource-based view theory application on the educational service quality. International Journal of Engineering applied science and technology, 6(6), 174-186. https://doi.org/10.33564/IJEAST.2021.v06i06.026
Wang, T., Abdallah, M., Clevenger, C., & Monghasemi, S. (2021). Time-cost-quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), 82-100. https://doi.org/10.1108/ECAM-12-2017-0271
Woschank, M., & Pacher, C. (2020). Program planning in the context of industrial logistics engineering education. Procedia manufacturing, 51(6),1819-1824.
https://doi.org/10.1016/j.promfg.2020.10.253
Wu, K., Zheng, M., & Shen, Y. (2020). A generalization of the theory of constraints: Choosing the optional improvement option with consideration of variability and costs. IISE Transactions, 52(3), 276-287. https://doi.org/10.1080/24725854.2019.1632503
Zadeh, N. H., Movahedi, M. M., & Shayannia, S. A. (2022). Human resource scheduling in project management using the simulated annealing algorithm with the human factors engineering approach. Discrete Dynamics in Nature and Society, 2022, 3597014. https://doi.org/10.1155/2022/3597014
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Evodia Iribagiza

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.